Process

How an Order Runs, Stage by Stage

Eight stages from the first enquiry to your forwarder collecting a crate. Three payments: 10% drawing fee, 50% production deposit, balance before shipment. The schedule starts when the deposit lands.

Reviewed by Stone Zeng, Export DirectorUpdated Factory Shunde, Foshan
01

Enquiry

You

You find us through a dealer, a project reference or a search. We talk about the wall, the room and the bottles before anything is drawn.

02

Drawing fee, 10%

You

A drawing fee of 10% of the order value is paid at this point. It covers the CAD set and the 3D visuals, and it is credited against the order once the order is placed.

03

Drawings

Us

Plan, elevation and internal structure, plus a rendered view of the cabinet in your room. Adjustments are made on the drawing, where they are free.

04

Scheme confirmed

You

You approve the scheme, then take the site dimensions yourself. We do not send a surveyor: the numbers you confirm are the numbers we build to.

05

Measured re-draw

Us / You

We re-cut the drawing to the dimensions you supply and send it back with every panel marked. Nothing is cut until that drawing is signed.

06

Production deposit, 50%

You

Half of the order value releases the order to the floor. This is the point at which the schedule starts — not before.

07

Build, 30–40 days

Us

Cutting, folding, welding, finishing, assembly and cooling, then a dry fit. Every order is dry-fitted, not sampled; the range is quoted per project.

08

Balance, then shipment

Us / You

We dry-fit, inspect, photograph and film the finished unit and send it to you. The balance is paid before shipment, then we crate it and your forwarder collects on EXW or FOB terms.

The three payments

What each one buys

Each payment releases a specific piece of work. Nothing moves to the next stage until the one before it is settled, which is why the dates we quote hold.

1 · Drawing fee · 10%

Ten per cent of the order value, paid before the CAD and the 3D visuals start, and credited against the order once you place it. It covers the drawing set and the renders, so the fee is not lost money if the project goes ahead.

2 · Production deposit · 50%

Half of the order value, paid once the measured drawing is confirmed. This releases the order to the floor: the schedule, the material reservation and the production slot all start here.

3 · Balance · before shipment

The remaining half, paid after the dry fit once you have seen photographs and video of the finished unit, and before the crate leaves. Then your forwarder collects on EXW or FOB terms.

What you send us

  • Three or more photographs of the wall, taken square on and from each end.
  • Wall length, ceiling height and the depth you can give up.
  • The bottle count you want to store, and the bottle shapes you actually buy.
  • Whether the room is temperature-controlled already, and how much it swings.
  • The finish direction, or a photograph of the joinery it has to sit against.
  • Who is doing the site measurement and the final installation — we do not measure on site, so this is your side of the job.

What you get back

  • Your own photographs, returned with every dimension marked on them.
  • Plan, elevation and internal structure drawings.
  • A rendered view of the cabinet in your room.
  • A fixed price against the confirmed specification.
  • A production slot with a date range, once the deposit is in.
  • A numbered setting-out drawing for your fitter with the crate.

Where the schedule can slip

Two things move a date: a site measurement that arrives late, and a finish change after the material is ordered. A colour match against a physical sample takes longer than one of our 63 codes because the sample has to be sprayed, approved and then applied to the full order.

Who does what on site

We do not measure on site. You supply the dimensions and confirm them on the measured drawing; from that signature we build to those numbers alone. The final fixing is done by your builder or fitter, and every crate ships with a numbered setting-out drawing so the modules go in the order they were made.

That split is deliberate rather than evasive. The person standing in the room with a tape can see the skirting, the socket and the out-of-square corner; a drawing cannot.

At a glance

Stages
Eight, from enquiry to collection
Payments
10% drawing fee, 50% production deposit, balance before shipment
Production
30 to 40 days after the deposit, quoted per project
Drawing return
About 48 hours after the fee and the photographs
Incoterm
EXW or FOB, quoted per shipment — tell us your port
Installation
By your fitter, with our setting-out drawing
Stainless steel wine cabinet modules assembled for a dry fit at BOGEQI
Champagne gold glass-front wine cabinet, finished and stocked
Dining room stainless steel wine cabinet installed after handover
From here

Where to go next

If the process is clear and the wall is measured, the next step is a drawing. If something above is still open, these pages answer it.

What the last stage looks like

Made in
Shunde, Foshan, China — frame, finish and assembly in one workshop
Frame
18 mm stainless sightline, folded to the measured wall
Materials
Stainless steel, tempered or low-E glass, felt-lined bottle cradle
Cooling
Embraco compressor, 110 V / 60 Hz for the US, 220–240 V elsewhere
Production
30 to 40 days after the 50% production deposit, quoted per project
Delivery
Crated, collected by your forwarder, with a numbered setting-out drawing
Installation
By your fitter, to our drawing; we dry-fit and inspect before crating
Questions

The five things buyers ask about the process

Is the drawing fee deducted from the order?

Yes. The drawing fee is 10% of the order value and it is credited against the order once you place it, so on a project that goes ahead the fee costs nothing extra. It exists so that drawing work is paid for as work, not used as a free quotation service.

How much deposit starts production?

50% of the order value, paid once the measured drawing is confirmed. The balance is due before shipment, after you have seen the dry-fit photographs and video of the finished unit.

What happens if the site measures differently from the drawing?

The drawing is re-cut to the dimensions you supply before anything is cut. Measuring on site is not part of our scope — the numbers come from you and are confirmed on the measured drawing, and those numbers are what the workshop builds to.

Is every order dry-fitted before it ships?

Yes, every order rather than a sample. The unit is assembled, inspected, photographed and filmed before it is crated, and that footage is what you approve before the balance is paid.

Which Incoterm do you quote?

EXW or FOB. Tell us your port and we will quote the term that suits the shipment, with the forwarder named, so the price you compare is a price you can act on.

Custom stainless steel wine cabinet, lit interior
Next step

Send the photographs first

You do not need a drawing fee to get an opinion. Send the wall and we will tell you what fits, what does not, and what the range is.